Most LED shower niche callbacks happen during tiling: the cut-out does not match, the frame cannot cover the tile joint, or the cable was never run to the right place. These are coordination problems, not product problems.
Dimensions to fix before tiling
- Cut-out: calculated from the outer frame plus the joint allowance, never from the inner shell alone.
- Frame width: must cover the tile joint; narrow frames demand tighter cut-out accuracy.
- Depth: check wall thickness so the body does not protrude into the adjoining room.
Waterproofing sequence
Recommended order: wall levelling, membrane, protection layer, niche fixing, tiling, then sealing. Add a reinforcement layer where the niche meets the membrane, and keep the frame dry and clean before sealing so the sealant bonds.
Cable routing
- Run the cable to the back of the niche before tiling, with enough slack for termination.
- Decide where the driver sits — behind the niche or in the ceiling void — because access differs.
- Confirm whether a separate switch is required during the electrical first fix.
Single or double shelf
Single shelf suits guest bathrooms with fewer products; double shelf suits hotel rooms and master bathrooms. Double units need more wall thickness and fixing points, and lightweight partitions must be reinforced.
OEM scope
- Outer size, cut-out size and frame width
- Single or double shelf and shelf height
- LED colour temperature, output and driver option
- Surface finish (brushed / mirror / PVD) and brand marking
What to send for a quotation
- Location (shower area / beside bath) and wall construction
- Cut-out dimensions or tile layout drawing
- Single or double shelf, and whether lighting is required
- Estimated quantity and delivery schedule
Note: general guidance only; electrical work must be carried out by a licensed electrician to local rules.